The soakaway chamber must be situated at least 5 metres from the nearest building, but you must allow 100mm clearance around the crates. The London Block Paving company in Broxbourne installed three crates in their site. The crates were stacked so that they didn’t collide with each other when being lowered into the chamber.
Drainage systems for block paving
If you’re planning to install block paving on your driveway, you should choose an appropriate drainage system. The block paving itself is not permeable, so any surface water needs to be moved and drained through a grid. Ideally, pipework beneath the block paving will be solid, and should be installed with rodding points at every change in direction. If not, the block paving may curl and weeds can grow in the joints.
Drainage systems for block paving UK come in many forms, and you need to choose the best option based on your individual needs. You may opt to install perforated plastic land drains, but be sure to choose a system that can withstand the weight of the block paving. Be sure to make a construction drawing to show the layout of the drainage. This plan will show the blocks that you wish to install, as well as the desired block paving style.
Linear drains are another option. These drains come in a variety of shapes and sizes, and can be made of polymer concrete, wet-press concrete, stainless steel, or HDPE. The best type of drain for your project will depend on the area you’re paving and how much rainfall you expect in a year.
Benefits of a soakaway
If you’re thinking of installing a soakaway on your block paving project, you should be aware of the benefits it can provide. The basic principle behind installing a soakaway is to channel surface water away from your home. The best way to do this is to dig a trench or pit that is at least one metre in depth. After this has been dug, you can fill the area with rubble or gravel to level the ground. Ensure that the rubble ends approximately 100mm above the drainpipe.
The underlying ground conditions for a soakaway are also important. Soils with permeable strata are generally suitable, but if the clay cover is very dense, a soakaway isn’t a good option. It’s important that the ground below is permeable, as a permeable sub-soil or bedrock will allow a soakaway to work. In addition, the soil should be relatively light and not too heavy.
Once installed correctly, a soakaway should be free of maintenance. However, you should occasionally lift the cover and check for contamination or silting. You can even install a catch pit at the base of the soakaway to collect silt from the inlet pipeline.
Choosing a site for a soakaway
If you have a block-paved driveway, you will most likely need to plan for a drainage system. You can use a linear drain system or a soakaway system. If you choose the latter option, you will need to consider the depth to which the soil is permeable. This is because your driveway may be located in an area where heavy rainfall occurs.
If you’re planning to install a soakaway, you must first determine how much water you expect to collect. The storage volume required is the difference between the base level of the soakaway and the level of the incoming drainage pipe. The soakaway must be at least five metres from any building. The depth should be at least 600mm below the invert level of the drainage pipe. If you have a shallow site, you can place two or three soakaways side by side. For larger projects, you can use large diameter segmental soakaways. But these require heavy lifting equipment and expert knowledge to install.
Soakaways are a long-established method for dealing with rainfall and septic tank effluent. Their purpose is to slow the runoff and redirect it away from a house or garden. The concept is similar to a reverse well. By slowing the flow of water, a soakaway can reduce the risk of flooding and prevent damage to the foundations of a building.
Planning permission
If you want to install a soakaway for block paving in your garden, you should get planning permission before you begin work. Planning permission is required for any project involving non-permeable materials. Permeable materials are those that allow water to filter through gaps in the paving and soak into the ground. The process to apply for a planning permission for soakaway for block paving UK can take up to 8 weeks.
Permeable block paving is laid upon a layer of permeable aggregate that is designed to disperse water over a large area. It allows water to drain away in an environmentally friendly manner and looks great. Larger areas may require a simple piping system.
For driveways and smaller gardens, you don’t need planning permission to install a soakaway. However, you need to get permission from your local council if you want to make a garden access across a council footpath. In some cases, you may need to strengthen the existing pavement to protect underground services. A professional directory or partner directory can help you find the right professionals for your project.
Click here to learn more about drainage specialists derby